KitLog pro

Powered By Kitlog Pro v2.0

ONEX #54 Web Site
' style=
Date:  11-2-2013
Number of Hours:  4.00
Manual Reference:  W12
Brief Description:  Right inboard skins

Drilled the skin and right tie down bracket to 3/8" and installed the eyebolt.

Installed the pitot/static tubes using blue Loctite on the screws. Connected the pitot/static lines to the tubes and secured them with spring clamps.

Checked that all was complete and satisfactory inside the right inboard wing and installed the CCP rivets. The new CCC rivets for the leading edges should arrive in a few days to finish riveting the inboard wings.

Applied Rust-Oleum 209460 "Specialty Plastic Primer" to the rudder cable fairings.
' style=

Right tie down installed

Right tie down installed

' style=

Right CCP rivets installed

Right CCP rivets installed

' style=

Rudder cable fairing primed

Rudder cable fairing primed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.